Projects Completed

  • Home
  • Projects Completed

Gute has extensive expertise in developing projects across different environments around Africa. Our continued presence within SADC and West Africa is reinforced by high levels of success in delivering practical solutions for value of money. To date, Gute has completed and/or is completing some or all of the following.

DESIGN, MANUFACTURE, ASSEMBLE, AND COMMISSION Metallurgical PILOT PLANTS

Design, manufacture, supply, install and commission of a 2 Ton per hour pilot plant comprising, milling, flotation, UFG, dewatering and sampling. (2013)

Design, manufacture, supply, install and commission of a benchtop flotation pilot plant for Mazowe Sands Plant. (2016)

Design, manufacture, supply, install and commission of 10 Ton per hour flotation pilot plant comprising (Crusher, Milling, Flotation, Dewatering, and sampling) (2017)

Design, manufacture, supply, install & commission various pilot plants.

  • Flotation
  • Spiral
  • DMS Plants
  • GRG Plants on trailers

 

DESIGN, MANUFACTURE, ASSEMBLE, AND COMMISSION

Gute has extensive expertise in developing projects across different environments around Africa. Our continued presence within SADC and West Africa is reinforced by high levels of success in delivering practical solutions for value of money. To date, Gute has completed and/or is completing some or all of the following.

Design, manufacture, supply, install & commission a Water reticulation system
(Pumps, storage tanks running ~2.5km (2015 to 2017)

Design, manufacture, supply, install & commission a Slurry mining, transportation, and screening system
for mining 2000 tons per day.(2015 to 2017)

Design, manufacture, supply, install & commission a Motor control centre for
(2015 to 2017)

Design, manufacture, supply, install & commission a Water cannon with capacity to produce a 30 bar water
stream continuously turning 360o around the pivot for Elvington Gold mine (2015)

Detailed engineering designs

200 000 Tons per month ROM ORE (Ongoing)

40 000 Tons per month (Ongoing)

200 000 Tons per month (still at Metallurgical stage)

120 000 Tons per month (still at concept stage) Ongoing.

300 000 Tons per month Metallurgical plant ( Starting with detailed process and engineering designs) Ongoing.

BUSINESS RESCUE AND TURN AROUND

Gute spearheaded the resuscitation of the following projects.

Resuscitated and commissioned the Elvington Sands Plant for gold recovery by CIL (2015)

Resuscitated and commissioned Exploration, Mining and Metallurgical Operations at Samira Hill Gold mine in Niger (Ongoing)

DISMANTLING

Dismantling, tagging, packing and logistics of the Sibanye PSA2 concentrator plant equipment and structures for re-use at Mimosa in Zimbabwe.

Evaluation, dismantling, tagging, packing and logistics of the the Marikana Aquarius PSA2 concentrator for re-use in Zimbabwe (Ongoing)

MODIFICATIONS AND RETROFITS

Modification (Design, manufacture, retrofit and commission) of Zimplats
Selous Metallurgical Complex pilot plant.

Design, manufacture, logistics, installation & commission a 55m3 agitated concentrate mixing tank (Ongoing)

Design, manufacture, logistics, installation & commission a 105m3 Process water tank. (2015)

Talk to us today

Please feel free to contact us Or just call us now.
  • 011 433 4234
  • info@guteh.co.za
  • 54 Tennyson Drive, Thulisa Park, Johannesburg

Why Choose GUTE

Integrity
Technology
Transparency

GUTE Company Profile

Please download our document to see specific data of the service and how we work.
Need Help?Talk to us